The team reached Aconcagua base camp at Plaza de Mulas (4360m) yesterday in good time, although it was a long day. Fortunately mules carried most of the gear to spare them the load.
Today they are acclimatizing and settling into their home for the next 2 weeks. The first leg up to Camp 1 (4940m) begins tomorrow, and there are no mules or Sherpas to provide support so the guys are resting up for the haul.